Prepare the site before the machine arrives.

Confirm access, foundation, power, water, air and drainage early so installation, commissioning and the first processing test can proceed smoothly.

  • Factory access and foundation
  • Power, water, air and drainage
  • Commissioning and operator readiness
Before deliveryYongtao machinery packed for delivery
01Confirm access
02Prepare utilities
03Plan commissioning
Site-preparation checklist

Six items to confirm before arrival.

Final dimensions, electrical load and connection requirements vary by model and configuration. Confirm the technical document for the exact machine before construction starts.

Access and unloading

Confirm the delivery route, doors, lifting equipment, unloading area and safe path to the installation position.

Foundation and space

Provide a solid, level, load-bearing foundation with working, maintenance and material-handling clearance.

Electrical supply

Confirm the required voltage, frequency, phase, grounding and cable route for the selected equipment.

Water and drainage

Prepare stable water supply, drainage and—where applicable—a settling or recycling arrangement for process water.

Compressed air

Confirm the available air supply, line route and required connection points for the machine configuration.

People and materials

Arrange operators, tools, the agreed sample material and the people responsible for acceptance and training.

Yongtao factory testing
Commissioning

Prepare for a controlled first test.

Before production begins, check the alignment, connections, lubrication, guards and emergency controls. Start with a no-load test, then process representative material under the agreed conditions.

  • 01Confirm machine level and frame alignment
  • 02Inspect power, water, air and drainage connections
  • 03Check guards, emergency stops and working area
  • 04Complete the no-load and sample-processing tests
Request the exact model checklist →